North Tyneside Council gives notice that it has made Orders under Section 14 (1) of the Road Traffic Regulation Act 1984. The effect of the Orders prohibits all through traffic on the following, and as and when signage indicates:
North Shields
On Coast Road/Heaton Terrace from outside number 113 Heaton Terrace to outside number 19 Coast Road.
An alternate route is available via Heaton Terrace, Langley Road, Holywell Road, Coast Road.
The temporary Order is required to install polyduct in the footway and carriageway and will come into force on 5 August 2024 for a period not exceeding 12 days.
Further information may be obtained by contacting Naomi Bentham of RJ Utility Services via email at naomi.bentham@rjusl.co.uk
On Lindisfarne Terrace Lane from the junction with Lindisfarne Terrace to behind number 45 Lindisfarne Terrace.
An alternate route is available via Lindisfarne Terrace, Trevor Terrace
The temporary Order is required to rebuild a fire hydrant chamber and will come into force on 5 August 2024 for a period not exceeding 6 days.
Further information may be obtained by contacting Barry Dent of Northumbrian Water via email at Barry.Dent@nwl.co.uk
On Linskill Terrace Lane to the rear of number 97 Linskill Terrace.
As this is back lane there is no alternative route, however access to be given where possible to residents/refuge.
The temporary Order is required to excavate and a renew a comm pipe and will come into force on 19 August 2024 for a period not exceeding 6 days.
Further information may be obtained by contacting Barry Dent of Northumbrian Water via email at Barry.Dent@nwl.co.uk
On the footpath that joins Pentland Close to Malvern Road.
An alternate route is available via Malvern Road, Winsford Avenue, Pentland Close.
The temporary Order is required to install ducting within the footway and will come into force on 19 August 2024 for a period not exceeding 5 days.
Further information may be obtained by contacting Stuart O'Brien of RJ Utility Services via email at stuart.obrien@rjusl.co.uk
Wallsend
On High Street East Lane from the rear of numbers 54-58 High Street East.
An alternate route is available via Park Road, Laurel Street, Chestnut Street.
The temporary Order is required for a comm pipe renewal and will come into force on 19 August 2024 for a period not exceeding 5 days.
Further information may be obtained by contacting Barry Dent of Northumbrian Water via email at Barry.Dent@nwl.co.uk