THE COUNCIL OF THE BOROUGH OF NORTH TYNESIDE CULLERCOATS, NORTH SHIELDS, SHIREMOOR, WALLSEND & WHTLEY BAY, NORTH TYNESIDE TEMPORARY RESTRICTION OF TRAFFIC ORDER 2025
THE COUNCIL OF THE BOROUGH OF NORTH TYNESIDE
CULLERCOATS, NORTH SHIELDS, SHIREMOOR, WALLSEND & WHTLEY BAY, North Tyneside
TEMPORARY RESTRICTION OF TRAFFIC ORDER 2025
North Tyneside Council gives notice that it intends not less than seven days from the date of this Notice to make an Order under Section 14(1) of the Road Traffic Regulation Act 1984. The effect of the Order will be to prohibit all through traffic:
Cullercoats
on The Broadway adjacent to number 292.
An alternate route is available via Marden Farm Drive, Shaftesbury Crescent, Farringdon Road, The Broadway
The proposed temporary Order is required for ducting and kiosk installations and will come into force on 17 March 2025 for a period not exceeding 13 days.
on Links Avenue from the junction with The Broadway to the side of number 179 The Broadway.
An alternate route is available via Links Avenue, Seacrest Avenue, Sandhurst Avenue, The Broadway.
The proposed temporary Order is required for ducting and kiosk works and
will come into force on 10 March 2025 lasting until 21 March 2025.
Further information may be obtained by contacting Ria Lake of Esh Construction on 0191 3774500.
North Shields
on Laet Street Lane from the rear of numbers 4-12 Laet Street.
An alternate route is available via Sibthorpe Street, Lower Rudyerd Street, Yeoman Street Lane.
The proposed temporary Order is required to replace a BT pole and will come into force on 31 March 2025 for a period not exceeding 2 days.
Further information may be obtained by contacting Liam Steen of Dutton TM via telephone on 01606 836 522.
on Lindisfarne Terrace Lane from the junction with Lindisfarne Terrace to the rear of number 45.
An alternate route is available via Lindisfarne Terrace, Trevor Terrace, Lindisfarne Terrace Lane.
The proposed temporary Order is required to complete a permanent reinstatement and will come into force on 30 March 2025 for a period not exceeding 5 days.
Further information may be obtained by contacting Barry Dent of Northumbrian Water via email at Barry.Dent@nwl.co.uk
Shiremoor
on Lesbury Avenue from the junction with Easdon Road to the side of no.58 Lesbury Avenue.
An alternate route is available via Earsdon Road, Upper Crone Street, Park Lane, Lesbury Avenue.
The proposed temporary Order is required to facilitate duct/kiosk works and will come into force on 24 March 2025 for a period not exceeding 5 days.
Further information may be obtained by contacting Ria Lake of Esh Construction on 0191 3774500
Wallsend
on Archer Street Lane from the junction with Mcnamara Road to the junction with Glanton Close.
An alternate route is available via Mcnamara Road, Shafto Street, Archer Street, Archer Street Lane.
The proposed temporary Order is required for lining works and will come into force on 3 March 2025 for a period not exceeding 5 days.
Further information may be obtained by contacting Ria Lake of Esh Construction via telephone on 0191 3774500.
on Orde Avenue Lane from the rear of numbers 24-34 Shafto Street.
An alternate route is available via Archer Street, Glanton Close, Archer Street Lane, Willington Street Lane, Shafto Street.
The proposed temporary Order is required to carry out sewer repair works and will come into force on 17 March 2025 for a period not exceeding 5 days.
Further information may be obtained by contacting Danielle Hetherington of Lumsden & Carroll Civil Engineering on 07791359805.
Whitley Bay
on Brierdene Road & Garsdale Road.
An alternate route is available via Gerrard Road, Garsdale Road.
The proposed temporary Order is required for a CCTV sewer survey and will
come into force on 20 March 2025 for a period not exceeding 1 day.
Further information may be obtained by contacting Sonia Nichols of Esh Civils on 07813366826.
on Cauldwell Lane Lane from the junction with Pykerley Road to the rear of number 6 Front Street.
An alternate route is available via Pykerley Road, Front Street, Cauldwell Lane, Woodleigh Road.
The proposed temporary Order is required to carry out sewer repair works and will come into force on 17 March 2025 for a period not exceeding 5 days.
Further information may be obtained by contacting Danielle Hetherington of Lumsden & Carroll Civil Engineering on 07791359805
on Park View adjacent to number 85.
An alternate route is available via Park View, Marine Avenue, Norham Road.
The proposed temporary Order is required to install a manhole flow meter and will come into force on 9 March 2025 for a period not exceeding 1 day. Activities will take place between 20:00 - 23:59
Further information may be obtained by contacting Ria Lake of Esh Construction on 0191 3774500.
on St Ronans Road from the junction with Kensington Close to approx. outside number 40 St Ronans Road.
An alternate route is available via St Ronans Road, Kenilworth Road, Abbotsford Park, Marmion Terrace.
The proposed temporary Order is required for ducting and kiosk works and will come into force on 17 March 2025 for a period not exceeding 15 days. Works expected to take 5 days once started.
Further information may be obtained by contacting Steve Gunter of Esh Construction via telephone on 0191 3774500
on Whitley Road Lane from the junction with Clifton Terrace to the junction with Laburnum Avenue.
An alternate route is available via Clifton Terrace, Fern Avenue, Laburnum Avenue.
The proposed temporary Order is required for a new service connection and will come into force on 17 March 2025 for a period not exceeding 7 days.
Further information may be obtained by contacting Sunbelt Rentals via email at traffic@freedom-group.co.uk
21 February 2025
Director of Regeneration and Economic Development
Quadrant East, The Silverlink North, Cobalt Business Park, North Tyneside, NE27 0BY